The year went fast, really fast but in the end the project has sprung back to forward motion.
A few steps forward is always good.
Custom metal valance mod as there was not a manufacturer located that makes a gt350 style metal front valance. Local good guy Cody Keeble stepped up for the task to make a one of a kind metal gt350 style valance with the large cooling area opened up. This will retain the front bumper and allow more airflow for the build.
The chassis has been dropped at the shop for the following:
Finish all welding and metal fabrication including inner wheel wells.
Modify front radiator support for larger radiator install.
Clean up all welds inside ans out of chassis.
Use panel bond adhesive and seam sealer on all panel joints ans connections for corrosion and rust prevention.
\Prep interior floor surface including trunk then seal coat. Prep engine department for engine mock up and coat.
Prep and undercoat seal entire under carriage.
Single turbo kit acquired and ready for mock up. This used kit has some impressive performance numbers behind it when installed on a 347 stroker.